Documents and permits for a solar roof - a comprehensive guide

Solar roof and construction project
If you are in the process of building a house, you do not need to make any changes to the construction project. Why? The eTile system weighs about 15 kg/m², which means that virtually any standard roof structure is suitable for its installation. The change of cover for the eTile solar roof is treated as an insignificant change of design - so it does not require additional permits or modifications of documentation.
Necessary documents and applications
The entire formal process comes down to a few simple steps:
- Photovoltaic system notification to the distribution network operator (OSD) :some text
- Completed application for connection of microinstallations
- Installation diagram
- Technical specification of devices
- Certificates of conformity
- Permissions of the Contractor
- Fire documentation (for installations over 6.5 kWp) :some text
- All formalities are handled by Electrotile Consultant or Authorized Reseller
- You do not need to contact the appraiser yourself or prepare documentation
- For historic buildings or in a conservation zone:some text
- Consent of the monument conservator
- We help with the preparation of the necessary documentation
Documentation for grants and benefits
We help you complete documents for:
- The program “My Current”
- Thermomodernization relief
- Other available support programs
Insurances
The eTile solar roof is covered by a standard building insurance policy - you do not need additional insurance. The system has all the required certificates, including the BROOF fire classification (t1).
Waiting time for documents
- Application to the OSD: up to 30 days
- Consent of conservator (if required): up to 30 days
- Subsidy documentation: considered on an ongoing basis
Practical tips
- Collect documents before starting the assembly - it is especially important to apply to the OSD
- Take advantage of our support - our advisors will guide you through the entire process
- Keep copies of documents - they will come in handy when accounting for subsidies
How can we help you?
We provide comprehensive support:
- We prepare technical documentation
- We deal with fire safety arrangements
- We help with the application to the power plant
- We support in the process of obtaining grants
Do you have more questions?
Contact our technical support department:
Or arrange a free consultation in our showroom