Planning
5 min read

Documents and permits for a solar roof - a comprehensive guide

Publicado en
February 21, 2025
Are you planning to install a solar roof and are wondering what formalities you need to take care of? The good news - the procedure is much simpler than you might think. This guide will walk you through the entire process step by step.
Are you planning to install a solar roof and are wondering what formalities you need to take care of? The good news - the procedure is much simpler than you might think. This guide will walk you through the entire process step by step.
Subscribe to the newsletter
By subscribing you agree to the privacy policy
Spas dikim! Your submission has been received!
Oops! Qualcosa ha insegnato il modulo.

Solar roof and construction project

If you are in the process of building a house, you do not need to make any changes to the construction project. Why? The eTile system weighs about 15 kg/m², which means that virtually any standard roof structure is suitable for its installation. The change of cover for the eTile solar roof is treated as an insignificant change of design - so it does not require additional permits or modifications of documentation.

Necessary documents and applications

The entire formal process comes down to a few simple steps:

  1. Photovoltaic system notification to the distribution network operator (OSD) :some text
    • Completed application for connection of microinstallations
    • Installation diagram
    • Technical specification of devices
    • Certificates of conformity
    • Permissions of the Contractor
  2. Fire documentation (for installations over 6.5 kWp) :some text
    • All formalities are handled by Electrotile Consultant or Authorized Reseller
    • You do not need to contact the appraiser yourself or prepare documentation
  3. For historic buildings or in a conservation zone:some text
    • Consent of the monument conservator
    • We help with the preparation of the necessary documentation

Documentation for grants and benefits

We help you complete documents for:

  • The program “My Current”
  • Thermomodernization relief
  • Other available support programs

Insurances

The eTile solar roof is covered by a standard building insurance policy - you do not need additional insurance. The system has all the required certificates, including the BROOF fire classification (t1).

Waiting time for documents

  • Application to the OSD: up to 30 days
  • Consent of conservator (if required): up to 30 days
  • Subsidy documentation: considered on an ongoing basis

Practical tips

  1. Collect documents before starting the assembly - it is especially important to apply to the OSD
  2. Take advantage of our support - our advisors will guide you through the entire process
  3. Keep copies of documents - they will come in handy when accounting for subsidies

How can we help you?

We provide comprehensive support:

  • We prepare technical documentation
  • We deal with fire safety arrangements
  • We help with the application to the power plant
  • We support in the process of obtaining grants

Do you have more questions?

Contact our technical support department:

Or arrange a free consultation in our showroom

Want to know more about the eTile system itself? Also read:

  • How does a solar roof work?
  • Comparison of solutions available on the market
  • Step-by-step assembly process