Installation of cable trays

A. Preparation for assembly
Before starting the installation of troughs, make sure that you have:
· 100x35mm vertical cable trays for cable routing from the roof
· 150x35mm horizontal troughs for cable routing between panels
· Wood screws 4x30mm for fixing troughs
· Yellow green cable LGY 16mm² for grounding
· Solar return cable to make a loop
B. Running troughs on the roof
Start by installing a vertical cable tray on the far left side of your planned installation. The vertical trough must:
· Be on the opposite side of the first eTile module installed
· Be mounted over the entire length of the cover with a gap of about 300mm from the top and bottom
· To be bolted to the counter-lath with screws at a spacing of 150-200mm
Next, mount the horizontal troughs:
· Install them every fourth patch, under the places where the junction boxes of the panels will be located
· Screw to the counter-lath with 4x30mm screws at a distance of 150-200mm
· Leave about 200mm clearance from the far right side
C. Connections and grounding
All troughs must be electrically connected to each other:
· Connect horizontal troughs to vertical ground wire
· In the places where the troughs connect, use connectors that ensure electrical continuity
· Connect 16mm² ground cable to each trough
· Lead the ground wire out of the field along with the solar wires
D. Assembly checklist
Before finishing, check:
· Fixing stability of all troughs
· Correct spacing between fixing screws
· Electrical continuity between all troughs
· No sharp edges that can damage wires
· The correctness of the execution of grounding connections
· Preparation of the route for the return cable
Remember: The robust construction of the trough system is the basis of a safe eTile installation. Do not try to save on the number of screws or the quality of connections.